Short answer

With roughly 1,674 watts of installed photovoltaic capacity per capita, the canton of Thurgau ranks 3rd of 26 Swiss cantons – clearly above the nationwide average of 946 watts per capita. In total roughly 507 megawatts are installed across 16,931 systems. For small systems under 35 m², Thurgau has neither a notification nor a permit requirement. (As of: SFOE register data August 2026, Swissolar annual figures 2025)

Key points in brief

  • Rank 3 of 26 cantons in per-capita density, with roughly 1,674 watts per resident.
  • 507 MW installed capacity across roughly 16,931 systems (register status August 2026).
  • Systems under 35 m² of module area are subject to neither notification nor permit in Thurgau – one of the most generous regulations in Switzerland.
  • In-roof share 5.6%, clearly below the nationwide average of 12.7%.

Why is Thurgau so far ahead in solar density?

With roughly 1,674 watts of installed capacity per resident, the canton of Thurgau reaches rank 3 of 26 cantons – surpassed only by Appenzell Innerrhoden and the canton of Jura. The register itself names no cause, but the combination of a rural structure with many large agricultural and commercial roofs and a comparatively uncomplicated notification rule probably contributes to this high value.

MetricValue (canton of Thurgau)Switzerland overall (comparison)
Installed capacity507.0 MW8,635 MW (register) / 9,498.6 MW (Swissolar)
Number of systems16’931331,271 (register) / 338,270 (Swissolar)
Per-capita capacity1,674 W/resident (rank 3 of 26)946 W/resident (Swiss average)
Average system size29.9 kWp26.1 kWp
Roof-integrated share5,6 %12,7 %

Source: SFOE plant register (register status August 2026); national comparison values from Swissolar's «Solar energy statistics 2025».

What applies procedurally in the canton of Thurgau?

Thurgau has one of the most generous regulations in Switzerland: under §§ 50a–50b PBV, systems under 35 m² of module area need neither a notification nor a permit. From 35 m², a notification to the political municipality with a 20-day period applies. In work zones, only area and output additionally count as criteria. The cantonal solar map ThurGIS was updated as of 2 September 2025 – since then a markedly smaller number of buildings is classed as requiring a permit than before (a decline of roughly 60 per cent compared with the previous classification).

From practice

The low in-roof share in Thurgau (5.6%) fits the picture of a rural canton with many large agricultural and commercial roofs, on which on-roof mounting is generally the more economical solution.

Frequently asked questions

Do I need a permit for every solar system in Thurgau?

No. Systems under 35 m² of module area are subject to neither notification nor permit. Only from 35 m² does a notification to the municipality with a 20-day period apply.

Is Thurgau really one of the strongest solar cantons in Switzerland?

Measured by per-capita density, yes: rank 3 of 26, clearly above the nationwide average.

What changed with the ThurGIS solar map 2025?

The updated map (as of 2 September 2025) classes markedly fewer buildings as requiring a permit than the previous version – a decline of roughly 60 per cent.

How current are these figures?

Structural data as of August 2026 (SFOE register), national comparison values from Swissolar's 2025 annual statistics.

Planning a solar system in the canton of Thurgau?

We clarify whether your planned system in Thurgau is subject to notification or permit at all.

Sources: SFOE plant register (register status August 2026), Swissolar «Solar energy statistics 2025», ThurGIS solar map (as of 2 September 2025).

Last updated: 18 September 2026 · Contact for questions on methodology: ecoEn editorial team