Architecture firms · planners · general contractors

Solar obligation partner for architecture firms and general contractors

Practically every new building project in the Zurich region is now subject to a solar obligation – and in the project phase, it's usually a side issue that still requires reliable figures. ecoEn provides architecture firms, planners and general contractors with exactly these figures: a guideline quote from your plans usually within 48 hours, PV data for the energy certificate and building application, and an option calculation you can use in discussions with the client. You keep planning authority – we take care of the solar part.

48 hguideline quote usually within two working days
Directspecialist company with its own installation team
Building applicationinput for the energy certificate
Planning authoritystays with your firm

References instead of renderings

Three completed projects with key data – from flat roofs to large-scale systems:

Large condominium project with over 100 kWp across two buildings in Fällanden – by ecoEn

Two apartment buildings, Fällanden

  • over 100 kWp · 274 modules · 2 buildings
  • ZEV across both properties · load management for e-mobility
  • Commissioned 2023/2024
26.85 kWp photovoltaic system with bifacial modules on a flat roof in Uitikon – by ecoEn

Flat roof Suracherstrasse, Uitikon

  • 26.85 kWp · bifacial modules
  • East-west layout for an even daily profile
  • Commissioned 2024
89.6 kWp large-scale photovoltaic system on the hangar of the Winterthur gliding club – by ecoEn

Hangar roof, gliding airfield, Winterthur

  • 89.6 kWp · 224 modules
  • Large-scale system on an industrial roof
  • Commissioned 2022

All completed systems with key data: Projects & references.

How we work with your firm

  1. Send plans. Floor plan, section and roof plan are enough to start – the earlier, the more cheaply the system can be fitted into the project.
  2. Guideline quote. System size, module layout and cost framework as guideline values – usually within 48 hours, directly usable for the cost estimate and client discussion.
  3. Input for the building application. We supply the PV data for the energy certificate and the solar aspects of the application; the submission stays with you.
  4. Option calculation. Minimum required versus full roof coverage, including the incentive situation – the basis for the client's decision.
  5. Detailed planning. Module field drawings, connection values and structural interfaces for your further work and coordination with the other trades.
  6. Execution. Installation, commissioning and registrations with the grid operator, Pronovo and incentive bodies – from one hand, coordinated with your construction programme.

The legal situation – in three lines

  • Canton of Zurich: self-generation for new buildings, guideline 10 W per m² of energy reference area (§ 10c EnerG, capped at 30 kWp) – in practice, it is met almost exclusively with photovoltaics.
  • Federal: solar system on new buildings with more than 300 m² of chargeable floor area (since 2025, Art. 45a EnG); the cantons regulate exceptions and may extend the obligation to smaller buildings.
  • Enforcement: via the energy certificate in the building permit procedure – no certificate, no permit. Depending on the canton, a compensatory levy may be due instead of the system.

As of August 2026; the current legal texts and cantonal implementing provisions apply. Details: Solar obligation in Switzerland · Building permit and notification procedure.

What we supply to your firm

ServiceWhat you receive
Guideline quote from plansSystem size, layout plan and cost framework as guideline values – usually within 48 hours
Building application supportPV data for the energy certificate and application documents
Planning documentsDatasheets, section and plan drawings of the module fields, information on structural interfaces and connection values
Option calculationMinimum required versus full roof coverage, including the incentive situation – prepared for the client discussion
ExecutionInstallation, commissioning and all registrations from one hand

If the project includes a heating replacement, storage or charging points, we plan these trades in as well – inverter, meter board and load management need to be coordinated early, not retrofitted.

Why the minimum required is rarely the cheapest option

The argument that regularly convinces clients – and is easiest to fit in during the project phase: a mandatory system of around 2 kWp carries the full fixed costs. Scaffolding, travel, planning, inverter and grid registration arise practically regardless of system size. Every additional kilowatt then costs only a fraction.

Then there's the incentive logic: what is subsidised is usually what goes beyond the legal minimum. Anyone who builds exactly the obligation pays for the most expensive kilowatts of the entire system – and at the same time forgoes the part that would be most economically interesting. And a later extension means: new scaffolding, a new electrician, often a second inverter.

We present both options side by side to your clients – as guideline figures, without sales pressure. In practice, the majority opt for more than the minimum as soon as they see the numbers.

When the system is visible: design, roof-integrated and facade

In exposed locations, core zones and replacement new builds, it's not the output that decides but the appearance. For these projects, we plan design-integrated options – and say honestly what they cost compared with the on-roof solution and what they mean for yield:

Installation partner for general contractors, EPC and energy suppliers

Large projects are built in partnership: the general contractor or EPC plans and coordinates, the energy supplier provides grid and billing – and the installation and electrical work is done by a regional specialist company. We fill this role. On behalf of owners, we have built systems in the ewz Solarsplit model, know the connection processes of ewz, EKZ, WWZ and AEW, and work with our own electrical installation and ESTI installation authorisation (Art. 14 NIV) – without subcontractors in the second row.

The model: planning, tendering and site management stay with you; we deliver installation, electrical installation, grid registration and acceptance as a work package or as a subcontractor – on commercial and industrial roofs, in housing developments and for portfolio roll-outs across several sites. We discuss capacity and time windows openly before committing. What we deliver at which system size is set out in the article Photovoltaics on industrial roofs; whether a general contractor or individual trades make more sense for a project, in the article General contractor or individual trades?.

Frequently asked questions

How quickly do we receive a guideline quote?
Usually within 48 hours of receiving the plans. Floor plan, section and roof plan are enough to start; for complex roofscapes or several buildings, we'll get back to you briefly and tell you how long it realistically takes.
Do you handle the submission of the building application?
No – the submission and planning authority remain with your firm. We supply the solar part: the data for the energy certificate, the module field drawings and the technical key figures the authority needs for the PV system.
Which solar obligation applies to our project?
In the Canton of Zurich, § 10c EnerG requires self-generation of 10 W per m² of energy reference area for new buildings, capped at 30 kWp. In addition, since 2025 the federal obligation under Art. 45a EnG has applied to new buildings with more than 300 m² of chargeable floor area. We clarify which rule applies in the individual case and which exceptions exist for your property – the cantonal implementing provisions are decisive.
Do you also work with general contractors?
Yes. For general contractors, we supply the same documents as for architecture firms, coordinated with your construction programme and the interfaces with roof, electrics and structure. What we say honestly: for very large framework agreements, we're not the right partner – our strength is project-based collaboration with short lines of communication.
What does the collaboration cost our firm?
The guideline quote, option calculation and input for the building application are free of charge and without obligation for you. We earn on the execution if the project goes ahead and the client chooses us.
Can you also just plan, without executing?
Our core business is planning and execution from one hand – that's why the documents are free for you. If a project goes to a third party for other reasons, that's no problem; but for pure planning mandates without an execution perspective, we're not the right contact.
Does ecoEn work as a subcontractor for general contractors and EPCs?
Yes. We take on installation, electrical installation, grid registration and acceptance as a work package or as a subcontractor – with our own electrical team and ESTI installation authorisation (Art. 14 NIV). Planning, tendering and site management remain with the general contractor or EPC; we clarify capacity and time windows before committing. We carry out systems in the megawatt range in this partner role, and roof systems from 30 to 500 kWp also as a complete contract.

Knowledge for the project phase

Got plans? We'll calculate.

Send us your floor plan, section and roof plan – you'll usually receive the guideline quote within 48 hours. And if nothing is pending right now: a short introduction makes the next project faster.