SERVICE

Heat pump Zurich: heating replacement by a specialist company

Heating replacement with a heat pump in and around Zurich: consultation, incentive application, installation and commissioning from one hand – from a direct specialist company.

Heat pump Zurich – heating replacement by a specialist company

ecoEn plans and installs heat pumps in and around Zurich – as a direct specialist company, with the incentive application and notification procedure from one hand. From the practical test on your existing heating to commissioning, you have a single point of contact.

We work in the City and Canton of Zurich – including Winterthur – and in the cantons of Aargau, Zug, Schwyz, Thurgau and Schaffhausen. Whether air-to-water heat pump or ground probe: we choose the system based on the building, not the catalogue – and if you wish, you can combine the heating replacement directly with a photovoltaic system.

Swissolar certified

Your partner for heating replacement in Zurich

ecoEn replaces oil, gas and electric heating with heat pumps – as a direct specialist company: one contract, one point of contact, warranty with ecoEn. We clarify flow temperature and heating load on site, handle the incentive application and notification procedure and, on request, match the heat pump directly to a photovoltaic system.

Single-family home in Ebertswil – reference property by ecoEn

Why ecoEn for your heat pump?

How your heating replacement works

A planned heating replacement runs in seven steps – if you start before the old heating fails, you have plenty of time and avoid a makeshift emergency solution.

  1. InventoryHeating load, radiators and hot water: we look at the existing situation on site – including a practical test on the old heating.
  2. System and legal clarificationAir-to-water or ground probe, installation location, noise protection: we clarify what's possible and sensible at your location.
  3. QuoteYou receive a transparently itemised quote with all items – without obligation and without small print.
  4. Incentive application before constructionThe order is decisive: the incentive application comes before construction starts. We prepare the documents.
  5. Notification procedureThe system is notified to the municipality; where necessary, we clarify permit questions for your address.
  6. Removal & installationThe old heating comes out, the heat pump goes in – coordinated and accepted by us.
  7. Commissioning & handoverFine-tuning, instruction and handover – after that, we remain your point of contact.

What does a heat pump cost?

The system type determines the price: air-to-water is the most common and cheaper system in single-family homes; the ground probe is more efficient but significantly more expensive because of the drilling.

SystemSwissEnergy reference (single-family home, complete)Biggest cost driver
Air-to-water heat pumpCHF 45,000–60,000Unit, installation, hydraulics
Brine-to-water (ground probe)CHF 55,000–80,000Ground probe drilling

SwissEnergy reference values (incl. installation, storage tank and hydraulics), as of July 2026, before incentives. Lower market offers often cover a smaller scope of services – the individual quote is decisive.

What's behind the ranges – unit, installation, hydraulics, drilling – is shown in the guide Heat pump costs Switzerland: guideline prices by type. Incentives are deducted from the gross costs: when replacing a fossil heating system, the canton and sometimes municipalities pay contributions – several thousand francs depending on the situation. The overview for the region: Heat pump incentives in the Canton of Zurich.

What's left after incentives? Net investment by canton

The cantonal base incentive is deducted from the gross price. The following overview shows the net investment for the six cantons where we have checked the current incentive programmes against the original documents – in each case the gross price minus the fixed incentive for a single-family home, excluding any output-based supplements.

CantonAir-to-water, net (single-family home)Brine-to-water/ground probe, net (single-family home)
ZurichCHF 42,100–57,100CHF 48,200–73,200
AargauCHF 42,000–57,0001CHF 49,000–74,0001
ZugCHF 36,500–51,500CHF 35,000–60,0001
SchwyzCHF 41,800–56,8001CHF 50,200–75,2001
ThurgauCHF 45,000–60,0002CHF 46,000–71,0003
SchaffhausenCHF 42,000–57,0004CHF 45,000–70,0003

Guideline values: reference price (table above) minus the cantonal base incentive for a single-family home, excluding output-based supplements – as of September 2026. 1 Additional output-based supplement possible (francs per kWth heating output), depending on system size. 2 Thurgau: incentives for air-to-water heat pumps discontinued in 2026. 3 Plus a possible photovoltaic bonus of CHF 3,000. 4 Schaffhausen: air-to-water incentive only with a sufficient photovoltaic system. The current incentive programme of your canton and your individual quote are decisive.

All conditions and incentive rates in detail: Heat pump incentives Switzerland: cantonal comparison.

Further guides on heat pumps

Heating replacement plus solar power: from one hand

A heat pump runs on electricity – and most cheaply on your own. Combining the heating replacement with a photovoltaic system lowers running costs and increases self-consumption; battery storage also shifts solar power into the evening hours. Because we plan and install all trades ourselves, we match the systems to each other from the start.

Free quote for your heating replacement

We check the building, incentives and choice of system for your address and prepare a no-obligation, transparently itemised quote.

QUESTIONS

Questions about heat pumps

SwissEnergy's reference values for a single-family home are CHF 45,000 to 60,000 for an air-to-water heat pump and CHF 55,000 to 80,000 for a brine-to-water system with ground probe – including installation, storage tank and hydraulics (as of July 2026, before incentives). Lower offers usually cover a smaller scope of services; the individual quote is decisive.
When replacing an oil, gas or electric heating system with a heat pump, the canton and sometimes municipalities pay contributions; depending on the situation, several thousand francs. The order is important: the incentive application comes before construction starts. We prepare the documents for you.
More often than its reputation suggests: what matters is the required flow temperature, not the year of construction. A simple practical test on the existing heating shows whether your house is ready – a full renovation is not a prerequisite.
Air-to-water is the most common and cheaper system in single-family homes; the ground probe is more efficient but significantly more expensive because of the drilling. What fits depends on the plot, heating load and budget – we clarify this at the site visit.
When planned, it runs in seven steps – from inventory through incentive application and notification procedure to commissioning. If you start before the old heating fails, you have a comfortable few months for it.
Yes – combining it with a photovoltaic system lowers the heat pump's electricity costs and increases the solar system's self-consumption. We plan both systems to match each other.
Yes. The initial consultation and quote are free and without obligation – by phone, WhatsApp or directly at your home.
FREE INITIAL CONSULTATION

Start your energy journey with a free consultation